Electric Power Research Institute About Us
The Institute
Office Locations

EPRI Summer Seminar

Each year, EPRI meets with executives and experts to discuss industry challenges and opportunities. Summer Seminar has played a crucial role in shaping EPRI’s research portfolio and the future of electricity worldwide.

Our Work Events
Large Electric Motor Users Group Vender ExpoOpen New Window
Glendale, Arizona
January 25-28, 2016

The Nuclear Maintenance Applications Center (NMAC) operated by EPRI, announces the Large Electric Motors Users Group (LEMUG) Meeting and Workshop. Participants are encouraged to come and discuss issues related to application and maintenance of their electric motors. There will be technical presentations and project plans discussed during this meeting.
Newsroom Careers EPRI Journal

Product Abstract

Addressing Solar Photovoltaic Operations and Maintenance Challenges

Product ID:1021496
Date Published:30-Jul-2010
Sector Name:Power Delivery & Utilization
Document Type:Technical Results
Price:No Charge

This Product is publicly available. This report or any part of this report may NOT be copied, reproduced, republished, uploaded, posted, transmitted or distributed in any way without EPRI's prior written consent.

   1.18 MB - Adobe PDF (.pdf)

Grid-connected solar photovoltaic (PV) systems are expected to become more common in the near future. Contrary to popular belief, PV power plants are not maintenance free; they require a routine of continual monitoring, periodic inspection, scheduled preventive maintenance, and service calls. This white paper presents a variety of information on PV operations and maintenance (O&M), system monitoring, warranty coverage, and safety protocols.

The Electric Power Research Institute (EPRI) conducted in-depth interviews with subject matter experts at six U.S. utilities and six private companies to discern the current level of knowledge regarding the operation and maintenance of distributed PV plants, reliability experience, and expected future approaches to managing expanding PV system assets. This paper includes selected lessons learned to date and O&M best practices gleaned from experience by the interviewees.

2010 Program 177   PDU Demonstrations
  • Photovoltaic
  • PV power plant
  • PV OM practices

For further information about EPRI, call the EPRI Customer Assistance Center at (800) 313-3774 or email askepri@epri.com


 Having Trouble Downloading?


Internet Explorer Information Bar

If using Internet Explorer the browser automatically blocks downloads by default, instead displaying an "Information Bar" at the top or bottom of the page.

Click "Download File" on Information Bar if using Internet Explorer 8 or older. If using version 9, click “Save” button on Information Bar and then select “Open” once downloaded.

Pop-up blocker software

You can hold down the CTRL key when selecting Download to bypass your pop-up blocker.

You may also configure your pop-up blocker to allow EPRI.com to open new windows.

Recommended Software

EPRI recommends using the latest version of Adobe Reader for best performance.


 Support Services


EPRI Customer Assistance Center (CAC):
800-313-3774 or 650-855-2121 Option 4

Hours of Operation:
8:00 AM - 7:00 PM Eastern Time (GMT-5)

Order and Conference Center:
800-313-3774 or 650-855-2121 Option 2